4.10.2   Fixing of reinforcement

The steel  reinforcement  shall  be  assembled  to  the  exact  shapes  and dimensions   as   approved  by  the  Engineer.  The  rods  shall  have  the approved cross-sectional area and shall be fixed accurately in the moulds. The ends of all tying wires shall be  turned into the main body of the concrete and shall not be allowed to project towards the surface. Spacing blocks shall be used to ensure accurate cover to the reinforcement, where necessary, and these blocks shall be of precast concrete of a strength at least equal to that of the concrete being placed. They shall be as small as possible in view of  practicality and shall be securely fixed in position by means of wires to be cast into them.

No  temporary  supports  for  the  reinforcement  shall  be  allowed  to  be incorporated  into  the  finished  concrete.  At  the  time  of  concreting  all reinforcement shall have been thoroughly cleaned and made free

of all loss rust (crude oil or any other coatings that might destroy or reduce the bond).

Unless otherwise specified or shown on the drawings, minimum cover shall be  determined  in  accordance  with  ACI  318-  77  as  indicated  on  the following table:




Description

Min. cover thickness

Cast against and permanently exposed to earth

75 mm


Exposed to earth and weather

D16 and smaller

40 mm

D19 - D 25

50 mm

Not     Exposed to weather and

Slabs and walls

D25 and smaller

20 mm




not  in  contact with   earth

Beams,     girder, columns

main   bars    ,    ties, stirrups


40 mm