8. FINISHING WORKS

8.1     Scope of work

Furnish all labour, materials and equipment for the completion of work as shown on the drawing and specified herein,




8.2     Plastering Work

8.2.1     materials

8.2.1.1   Juss

Juss shall be locally produced natural gypsup in iraq, and shall be fresh, completely dry and well ground material and shall not leave residuals on 56 mesh/cm sieve, and shall be free from extraneous Which may be affected by spontaneous slating. Juss shall be kept in adry area,  covered  and protected from moisture, juss shall be the best grade obtainble from an approved  source and completing with relevant Iraqi standards.

8.2.1.2 Sand

Sand for finish coats shall be clean and well graded from coarse fine as specified in concrete work

8.2.1.3 Cement

Cement shall be specified in section 4-2-1 (concrete work)

8.2.2 Plastering accessories

All plastering accessories shall be approved on samples by the Engineer before starting  plastering work. Such accessories, including corner beads, casing beads, lath  and  other  saterials,  shall  be  used  where  and  necessary  for  workmanlike plastering work.

8.2.3.1 Working environment

maintain uniform ventilation and a temperature of not lower than 5C until plastered surface are dry.

Excessively rapid drying shall be prevented.

8.2.3.2 Surface preparation

Dust, Oil, grease and other