PREPARATION
1.1 Description
Site
preparation work consists of site clearance, survey, cutting, imported fill,
embankment and construction of ditches for drainage. Work of this section
includes all measurement and materials required to complete the supply,
execution and construction of site preparation.
1.2 Site Clearance
The contractor shall
clear, from all areas planned for the work, all buildings, materials, debris,
etc, prior to the cutting and filling work taking all necessary precautions to
prevent damage to the existing road structures and buildings or other
facilities, in the area, which shall not be demolished.
1.3 Survey
Prior to commencement of the
work, the contractor shall check the existing bench marks and reference points
located on or out of the site as indicated. The contractor shall establish newly
standard bench marks and points for the works within the site with the agreement
of the Engineer.
a.
Traversing
Prior to execution of the works the contractor shall check
the existing reference points, and the results shall be submitted to the
Engineer for approval.
b. Principal
points
Principal points shall be established taking advantage of the
existing reference points.
Individual principal point posts shall be of wood,
15cm x 15 cm size, with an indicating nail on the top, the surface of the post
above the ground shall be painted white.
c. Bench marks
When establishing bench marks
within the site, a minimum