Consists of site clearance, survey, cutting, imported fill, embankment and construction of ditches for drainage. Includes all measurement and materials required to complete the supply, execution and construction.
Civil Word Here -->>
Showing posts with label Elocution. Show all posts
Showing posts with label Elocution. Show all posts
Saturday, May 5, 2012
Elocution
11.8 Elocution
1.8.1 General
The entire work: shall be constructed to the exact position and elevation in conformity to the lines and grades shown on the Drawings or as directed by the Engineer. The contractor shall provide his own men and instruments for determining alignment, elevation and position of all construction between any points, subject to the chock and correction by the Engineer,
11. 8. 2 Inspection
Examine the areas and conditions under which paving is to be installed and remedy any conditions decremental to the proper and timely completion of
Subscribe to:
Posts (Atom)